Yearly Archive: 2019

Roof Truss Banner

Roof Structure removal and Demolition of Plant Room

Prestigious private school, Mentone Grammar, have upgraded their Aquatic facilities and Strategic Demolition were engaged in the demolition of the Plant room and the corroded roofing structure. As a result of the corroded roofing structure, we had to perform the demolition works using height access equipment, including scissor lifts, boom lifts and fall arrest systems....

Read more
Untitled Design (4)

Structural Demolition at Melbourne Aquarium

Melbourne’s iconic tourist attraction at Melbourne Aquarium were undertaking major upgrades to further expand their Jelly Fish Breeding exhibit. Strategic Demolition was trusted with the challenging project task of demolishing approximately 250tonne of concrete and block wall. Sensitivities around the Aquarium’s life support structure meant our methodology went through stringent checks to ensure safety of...

Read more
Untitled Design (3)

Escalator Demolition at Parkmore Shopping Centre

With Parkmore Shopping Centre upgrading their accessibility and shopper experience, we were engaged to demolish the existing escalators. Due to regular trading hours, noisy works were restricted to nights. Separation of existing concrete slab at either end of the escalators was required so the escalators could be lowered and removed. In preparation for the new...

Read more
Untitled Design (1)

Industrial Demolition at Toyota Parts Warehouse, Altona

At Toyota Altona, Strategic Demolition was contracted to complete the major refurbishment and Industrial Demolition of the existing Toyota Parts Warehouse, making way for a new logistics entry to their upgraded parts warehouse. The use of our 50tonne Excavator with shear attachment, allowed us to demolish the existing truss frame, roof structure and warehouse façade....

Read more
Bourke St Melbourne commercial demolition

Commercial demolition on Melbourne lobby – 565 Bourke Street

Strategic Demolition was contracted to carry out a commercial demolition of a Melbourne ground level lift lobby, café and office structure. The buildings lobby, spanned 3 storeys and featured marble cladding and flooring, concrete plantar boxes and steel pedestals. The cladding and marble flooring all had to be removed by hand as the polished concrete...

Read more
Stcatherines2-resized

Large-scale demolition project at St Catherine’s Primary School, Toorak

St Catherine’s Primary School is a prestigious private school located in Toorak. Strategic Demolition was contracted to demolish the existing 3 storey brick Junior School Building. During this large-scale demolition project in Toorak our team were faced with multiple challenges; restricted access, existing features to remain, including a 100 year old Elm Tree and a...

Read more